The Enzed Transport blog is for transport and infrastructure activism in New Zealand. Visit our Facebook page at Enzed Transport
Saturday, 5 December 2015
The Historic Waiau Branch 1: Waipara [1]
Sunday, 7 November 2010
Waiau Branch : Part 5 – Waikari to Hawarden
As noted elsewhere, the Weka Pass Railway began the removal of all track beyond the Waikari road crossing in 1986, in various stages. These were:
-
March 1986: WPR decided to recover all track between the Hurunui River and Medbury. Commenced May 1986 and was completed August 1987.
-
November 1986: WPR decided to recover all track between Hawarden and Medbury. (The Hawarden backshunt had however been lifted in mid 1985) Work started late 1987 and was completed mid -1991. The Waitohi River bridge beams were not recovered until 1996.
-
October 1988: WPR decided to recover all track beyond Waikari crossing. Completed mid-1991 when the Waikari yard was lifted.
Photomap. Zoom in and click on photos for more information.
View Larger Map
Main map. Zoom in and click on placemarks for more information.
Sunday, 15 August 2010
Waiau Branch Railway album on Picasa
As alluded to in a previous post, I have been busy today creating a single Picasa web album for all my Waiau Branch photos. This of course includes all Weka Pass Railway photos. At the moment the album is just over 400 photos, all of which have been geotagged. The next step is to remove duplicates (the same photo with two different names) and after that to caption every photo. Once those tasks are complete the album will be ready to share – whether directly with people, or through inserting photos or maps into postings on this blog. As already alluded to the earlier series of posts relating to the WBR / WPR will be altered to use the photos from the album instead of duplicating with the pictures being put into Blogger’s album.
This is quite a big step and is roughly comparable to putting together my big Otago Central album about a year ago, although there is a big difference in that the OCR album has got many older pictures rescanned at a larger size (up to 1600 pixels), whereas all the Waiau pictures are without rescanning. I don’t intend to rescan anything for the Waiau album at this time as it is quite a major job, and the pictures which were captured off video can’t be made bigger anyway. The Waiau album includes a small number of scans from other sources, video capture images from the videos I made of the 1999 and 2001 Waipara Vintage festivals, lots of photos and a small number of slides that I took at various times.
UPDATE: Some of the photos will be rescanned at a later date to get them into Panoramio (minimum 500 x 500)
Saturday, 24 July 2010
Recent Articles
Completion of this series means I can move on to the Waiau branch article series and other similar material.
Early Years of the Weka Pass Railway – Part 14 : 1990-91
Early Years of the Weka Pass Railway – Part 13 : 1989 (B)
See part 12 for a narrative of 1989 events.
June 1989. Harold Feather’s truck is loading at one of the banks in Hawarden yard. At left is the main station building with the men’s urinal the enduring structure (that is possibly still there today).
June 1989. Getting ready to tow rails off the formation across a small bridge/culvert. Ken Parker and Lindsay May to the right, the location is just north of Hawarden with the township in the background.
June 1989. Track still in place just north of Hawarden (looking north) alongside the oxidation ponds.
June 1989. Loading sleepers onto a truck at Hawarden level crossing.
August 1989. The recently acquired 10 ton diesel crane lifting the air compressor. This was taken by road to Waikari for a day’s work lifting track north-west of the station.
August 1989. As the NZR Waipara yard works continued, the redundant home signal at the north end was removed by a contractor. This signal has been re-erected at Glenmark. At right the loop extension works can be seen, with the WPR sidings at left.
August 1989. A little later the loop extension was completed, the old turnout to the former loop is still in the mainline at right. On the left are the Weka Pass Railway sidings.
August 1989. Beginning a day’s work with a quick look from the vicinity of the 16 km peg in the direction of Fenwicks Road crossing. Here we are looking along the straight towards Waikari, this stretch includes Bridge No.4 of which the guard rails are just visible in the distance, and No.3 closer to the crossing.
August 1989. Fenwicks Road crossing and Bridge No.3. The line curves around to the north ending the long straight run up from Waikari station.
August 1989. Starting work at Fenwicks Road over Bridge 3. The air compressor and tools were at work here due to the track being screwspiked.
August 1989. Further up the straight, the trolley with the compressor is seen sitting on Bridge No.4.
August 1989. Glen Anthony is hard at work lifting track on Bridge No.4 with an old milepost to the right.
August 1989. Rounding the curve near 16 km, an old trolley stand is seen. The track here is held in place with elastic spikes requiring crowbars to remove. An alternative solution for separating the rails is to jack up the track and sledge hammer the sleepers off. The compressor and air tools are still in use, now just for removing the fishbolts at rail joints.
August 1989. Fenwicks Road, looking towards Waikari.
August 1989. Rounding the curve near the 16 km peg.
Early Years of the Weka Pass Railway – Part 12 : 1989 (A)
1989. The works wagon at Glenmark as the train is prepared for another day’s work. One half of the wagon stores equipment and fittings while the other half is a lunchroom complete with pot belly stove. Its purchase marked a major step forward in providing for crew comfort during workdays on the line.
1989. The Glenmark station development is progressing well with the annex built onto the station (which houses the train control equipment). The platform has been filled with gravel – sealing would come at a later date.
1989. TR 275 was towed up from Christchurch and used for a time before being taken by road to Nelson for use by the Nelson Railway Society (then called the Grand Tapawera Railroad Co).
1989. C 864 operates a passenger train approaching No.1 Gate during the Federation conference.
1989. A rake of old guards vans are seen in the Waipara public siding. I believe these vans went to the Waipara Sleepers holiday park nearby although their website states theirs arrived in 1993.
1989. Track removal works north of Hawarden with rails waiting to be recovered. The gangers shed to the right was also removed and is now in use somewhere in the Weka Pass.
1989. Ballasting up the line in one of the many cuttings after track repairs.
1989. The same cutting showing the Plasser 04 tamper at work. The tamper did some great work when it was running but its operation was very sporadic due to numerous breakdowns. On this occasion or another when I was present the radiator hoses burst resulting in a “dead” gravity-assisted trip back to Glenmark.
1989. The tamper at work. The tines are in the lowered position tamping under the track. Gary Kelly is profiling ballast on the far side. Operating the machine (when it worked) was as simple as positioning directly over a sleeper and pushing a button to initiate the automatic tamping cycle in which the built in jacks lifted the track a predetermined amount and the ballast was then tamped under the sleepers. The trolley on the long arm in front (see previous picture) was used to
measure the level of the track (and thus the amount of lift needed).
1989. Looking north from the Hawarden station yard, we can see the level crossing that was removed by the Hurunui District Council. Most of the yard sidings were still in place and the site was being used as a collection point for the lifted track.
1989. Track removal work in progress just north of Hawarden, looking south.
1989. At the north of the Hawarden yard, one of the tracks that formerly crossed the road is still in place under a stack of rail.
1989. The main line and most of the siding track is still in place at the south end of the Hawarden yard (except for the backshunt, which was removed in 1985).














