Showing posts with label Otago Railways. Show all posts
Showing posts with label Otago Railways. Show all posts

Sunday, 9 August 2015

Cycle Trail Maps

Back here I did write about the maps available from the NZ Cycle Trails website which, theoretically, could be added to my maps. I'm kind of split over that. The raw GPS trace can contain inaccuracies, so either I can post the raw traces and mark them as "approximate", or wait until the routes become visible on some other map then work from both sources.

For the interest of the maps I draw I think it will be a case of waiting until more information is available about the reuse of each rail route, so the maps won't necessarily show the full cycle trails, but will focus on rail trails more. Perhaps the easiest way is to wait for Linz to update their layers and then bring those in, which I expect will be the quickest and simplest way of getting the data into maps. However, some questions over the use of rail routes may linger where there is a possibility of deviations from these routes.

UPDATE: Well I thought the easiest way to check would be to download the latest LINZ tracks layer, this is the layer that contains everything they define as a track, including cycle, foot and vehicle tracks. Although there are some that have been added, I didn't see a whole lot of new ones or all of the nzcycletrail ones. Which is a pity, but we hope that they will update. Here are some examples:




I know about the Roxburgh Gorge trail because of it being marked on Google Earth, along with Panoramio photos. And according to both of those the trail is on the west bank of the river, so it is not the existing foot track we can see on the east bank down to Doctors Point. Now, I have shown the data from the new table as green lines - and underneath that you can see dashed lines, which means they were already in the map, and the "foot" symbol shown in a number of places above is also part of the existing map symbology. So surprisingly perhaps, considering it's more than two years since some of those Panoramio photos were taken, no trail.


This is more promising - down between Minzion and Millers Flat - with no existing track marked under the green, that is a new section - and it turns out that is classified as a foot track and it does correspond with the GPS trace from nzcycletrail.com. Unfortunately that's as good as it gets. 




So here for example is Big Hill Tunnel - that's been open for some time I believe, well in advance of the trail (unless I confused it with one of the other tunnels like Manuka). But no marking.

OK I understand Linz are busy people and this is a free service - and if they are using traditional techniques from aerial photography, it also depends on how often that photography gets updated.

Saturday, 15 May 2010

NZ Rail Maps site changes and updates

I regret to say that a third article in a series about the Seasider is not coming soon. It is at the moment too difficult to juggle the limited amount of time I have for this hobby (at most 1 day a week) with the various interests I have within it. You should go and look at the web album referred to in previous posts and the previous two messages for content about the route of the Seasider. It is just a reality that I don’t have much time at all for rail interests except during the school holidays.
The site has been changed about a bit, the most obvious being that the original layout has been reverted to. This is that all of the files for a particular line, whether new or old, are in their own specific directory, and that the most current version of the file always has the same name. This means I don’t have to maintain a separate directory of files whose names never change for blog postings. A further change just executed today is that all previous versions have been renamed so that they will appear alphabetically lower on a page than current versions. This means all current versions always appear first in the page listing (as they have been changed to sort alphabetically).
Updates continue but are not being publicised specifically here. The major area of update of late has been the Otago area with 7 updates since my holiday at the beginning of April. Some of that relates to that holiday, obviously, and other improvements are relating to the Remnants series of articles. These are also halted at the moment, as they are big efforts that take a lot of time, and at the moment I have just about exhausted the list of lines that have the best GE and (especially) StreetView coverage.
I had hoped to recommend a change detection service for anyone who wants to have updates to the site automatically notified. It doesn’t look like that can be easily implemented at the moment because as it stands the banner ads on Trainweb pages will cause a change notification every time they are updated.

Sunday, 25 April 2010

Seasider photos

I have just finished editing my photo album with the pictures of the Seasider trip that I went on so these can now be viewed. There are over 200 photos, all geotagged, all along the line. On the way back I was able to stand on the rear platform of the train so there are many photos of track features in the latter part of the album. The promised third article will be coming some time this week.

Friday, 23 April 2010

Remnants of the Kurow Branch Today

The Kurow Branch went inland from the MSL at Pukeuri, close to the south bank of the Waitaki River, except for a short extension to Hakataramea on the north bank. It was opened in stages from 1875 to 1881. Kurow-Hakataramea closed 1930, the rest in 1983. Kurow is close to the site of the Waitaki Hydro Dam and the line carried significant traffic related to that and subsequent hydro works.

View Larger Map
In this view, the Ngapara / Tokarahi Branches are seen directly below the line of the Kurow Branch. When I first did the map in Google Earth, I used L&S and found it extremely difficult to decipher some of their instructions. Eventually I concluded that there must be some mistakes in their written account. The symbols on the map, cross referencing multiple sources, are, I believe, the most accurate interpretation of their account against the other sources.
We begin our exploration at Pukeuri, directly opposite the freezing works. The line curved away from the MSL here to cross SH1. Go south to the intersection with SH83 and head inland to follow the branch.  Within the first km the routes close in. Continue west on SH83 with the railway 200-300 metres north. At Papakaio turn into Cameron Road to view the level crossing, then follow the sealed road parallel to the railway to reach the Papakaio station site which the road appears to partly occupy. Return to SH83 continuing west, turning into Gibson Road after 2 km and head north 1.5 km to Gibson station site. Continue north on Gibson Road to Peebles Siding Road turning left into the latter, continue west 1.5 km to view the Peebles station side slightly north-west of the intersection with Peebles Road. Continue west on Peebles Siding Road to Jardine Road and turn right, travel 1 km north to Irvine Road and turn left to view significant bridge remains 150 metres further on. Continue in the same direction on Irvine Road to eventually return to SH83 and turn right. Take the next right turn, Wilson Road, and travel 1.2 km to the level crossing near Aitchisons station. Continue north on Wilson Road until you come to Aitchison Road and turn left, crossing over the line shortly thereafter, and continue west and then around a sharp 60 degree curve to reach Uxbridge station. If you wish you can follow Uxbridge Road alongside the water race heading west, just be aware that you will need to ford a stream further on (this being the site of a bridge on the railway directly alongside). Alternatively Aitchison Road continues south back to SH83, as does Uxbridge Road eventually.
Continue west on SH83. About 3 km from the Uxbridge Road intersection another bridge remains in place, then another 400 metres further on, a now-private road leads north to the site of Black Point station.  After another 1 km the railway comes right alongside the road, diverging again 500 metres further on near Bortons station. The railway then continues in a straight line while the road goes left, and then comes right to close in again. As you near Duntroon, crossing the Maerewhenua River, the old combined bridge was about 100 metres downstream. Road access is possible to both ends of the former site. Opposite Middleton St in the township you see the Duntroon station building still on site beside the road. Continue west on SH83, the railway now further away to your right. The road veers left 3.2 km further on as the railway comes right alongside, turning south and then back west; you can see bridge abutments in the middle of the second curve. 600 metres further on was the Waikaura station. Road and rail continue alongside for another 1.2 km then split as the highway climbs up the side of a hill; 2.5 km further on, the railway crosses SH83 on a skew, then remaining close alongside as the road turns to follow it. Crossing the Otekaieke River on the outskirts of the township, the old rail bridge was only 30 metres to the left. The station site was about 300 metres further west.
Onward, westward, on State Highway 83. The next station 6 km further on was Strachans. In between are at least four bridge sites - 1, 2 (the largest at the Otiake River, where piles remain), 3, 4 - and another crossing of SH83, at which the road has been straightened. The current highway route thus cuts through the formation before passing the former crossing site on the right a little further on. Routes are right next to each other for almost all of the 3.2 km to the next station, Hilles. Several hundred metres further on the railway veered left to cross over SH 83 again, right on the south bank of the Kurow River – there is no apparent trace of the bridge today. As you approach Kurow, take Ferguson St on the left and then Gordon St on the right to drive alongside the railway formation as it approaches the site of the Kurow station. As you continue along Gordon St the line starts to curve around for the short run north to Hakataramea. Turn right into Ranfurly St and cross over SH83 onto SH82 for the crossing of the Waitaki River; the railway comes in on the right. The bridge, originally a combined road-rail structure, still stands at the time of writing, but a replacement project has commenced so it may not be here much longer. It appears that the Hakataramea station was probably in this area immediately north of the bridge. U-turn and drive back to Kurow, this time take the station road next to the Waitaki Hotel to reach the station site and building.

Remnants of the Tapanui Branch Today

The Tapanui Branch is somewhat misnamed, as the eponymous locality is about halfway along the branch, instead of at its terminus. Leaving the Main South Line at Waipahi, it was opened to Kelso in 1880, Heriot in 1884 and Edievale in 1905. The last section was closed in 1968; the rest of the line closed in 1978 due to damage caused by massive flooding. Kelso township was abandoned following subsequent flooding and today the railway goods shed is the sole remaining building in the area.

View Larger Map
The other line you can see upper right is, of course, the Roxburgh Branch, and it is interesting that the Tapanui line got within about 10 km of the former. At the time that Edievale got its railway, it would have competed with Lawrence as the railhead for the area. Subsequently the Roxburgh Branch was opened to Big Hill in 1910, Beaumont in 1914 and Millers Flat in 1925.
We begin at Waipahi on the Main South Line, 50 km west of Balclutha. The branch headed away east and then north from Waipahi, paralleling the MSL at the level crossing just off SH1 on West Otago Road. Take West Otago Road north out of Tapanui; as you cross the Waipahi River after 200 metres, the abutments and piers of the old railway bridge are visible 100 metres east. After about 300 metres, take an optional side trip to the right on Old Main Road to the level crossing site 200 metres further on. Returning to West Otago Road, the railway is now on your right for the next 1 km, about 300 - 500 metres due north, following the Waipahi River, before both routes turn in opposite directions. Continue on West Otago Road for the next 7 km to reach a level crossing with a small bridge still in place just to its south. The railway embankment at this location gives public walkway access to the No.1 tunnel about 600 metres south. Continuing north on West Otago Road, the Conical Hill station site is just past the level crossing on your left. Another level crossing of Conical Hill Road is soon encountered, then about 300 metres further on you pass the Pomahaka River Bridge on your left, which remains substantially complete. An option is to take the right hand turn 300 metres further on to River Road, which runs back south on the opposite bank to the railway in its stretch between Waipahi and Conical Hill alongside the Pomahaka River. However it is mostly unsealed and you will have to double back at the confluence of the Pomahaka and Waipahi Rivers, after 2.5 km.
Heading north on West Otago Road which has become Pomahaka Road, 1.5 km after the Pomahaka River bridge, we come to the Conical Hill sawmill site on the right. In its time this was connected to the railway by a private siding which must have crossed the road. The railway formation alongside the road is quite well defined as you drive past the sawmill site. There could have been sidings alongside this raised edge just outside the present fence but I really have no idea. This is just opposite the point where the railway passed in front of a local substation. As you continue north, the road and railway both take an S bend, left then right; 100 metres after the intersection of Koi Flat Road on the left you pass the Pomahaka goods shed. Road and rail are then parallel close together for the next 2 km until the railway turns away on the approach to Glenkenich station. The road turns eventually to parallel the railway, which crossed several bridges, one of which appears to be semi-intact in some form today. The station site is just north of the intersection of Pomahaka Road with SH90, which the railway crossed on the level, but there is nothing to be seen there. Continue north on SH90 with the railway just to the left of the road until the latter turns rightward towards Tapanui. We recommend that you take a left turn into Duncan Road South which keeps you closer to the railway although it is still diverging rapidly. About 1 km further on take a left turn into Station Road and proceed west for about 700 metres to a level crossing and the Tapanui station site. From here you can see the route heading north as it heads for the Pomahaka River. You, however, must U-turn and head back to Duncan Road South, turning left to head north-east and rejoin SH90 after 3 km. After another 1.5 km, turn left into Wooded Hill Road and drive west for 3 km until you encounter the level crossing on the outskirts of Kelso, just before a small bridge and 90 degree bend in the road. Now heading north, you pass a bridge site before coming to the Kelso station site on the right, where the goods shed is the only remaining building in the township; the remainder was demolished or relocated after two devastating floods, including the one in 1978 that closed the railway.
Wooded Hill Road soon takes a sharp left hand turn before reaching a T intersection with Ardmore Road; turn right into the  latter and continue north. The railway is now some hundreds of metres out to your right. At Park Hill Road you can take a side trip to the level crossing with a small bridge apparently still in place 300 metres north. Stay on Ardmore Road as you head north, passing another intact bridge opposite Kelso Settlement Road. Black Gully Road West leads to another level crossing on the approach to Heriot, where the road and rail are parallel throughout the township. Turn into Mathesons Corner Road, close to the station site, to follow the railway route. At a right angle bend the railway veers away. Continue east and take the left hand turn at the intersection with Cabbage Road. Continue until the intersection of SH90 and turn left, heading north. Drive another 5.5 km until you come to a right hand bend in the highway, going straight ahead into Edievale Road. Passing some old houses and abandoned shops, 200 metres further up you can see the Edievale station site on your left, where there appear to be no substantial remnants.
For an alternative trip back to Heriot, continue on down Edievale Road to McHutchon Road, turning left, continuing straight ahead into Dunrobin Road, which eventually leads to the northern outskirts of the township. The rail route is at the foot of the immediate hills in this Dunrobin Road view near Heriot.

Monday, 19 April 2010

Industrial Sites of the Ngapara-Tokarahi Area

In the course of my recent article on the Ngapara and Tokarahi Branches I read about a considerable part of the industrial history of the area. The main features are summarised below.
Limeworks have long been a feature of the areas. NZRTA shows that McDonald’s Lime had an operation at Weston, but does not give any more detail of it. The best possibility I have been able to come up with for a possible location is this location, without any clues at all, and purely based on looking from above and presuming that there might have been an industrial operation at this site. For which I have no confirmation whatsoever at this time. McDonald’s is now a majority owned subsidiary of Holcim and operates exclusively in the North Island.
Taylor’s Lime is a bit easier to pin down. They used to operate two quarries further up the Ngapara line, at Cormacks. One of these quarried Oamaru stone for the domestic building trade, and the other was for agricultural production. Taylor’s, which operates exclusively in the South Island and is also a Holcim subsidiary, own the Dunback (Makareao) limeworks, and they chose to consolidate their operations there with the construction of a new plant in 1990. Obviously, they didn’t need a rail siding to Makareao any more. They then sold the operations at Cormacks to Parkside Quarries, who continue to produce lime and stone. Here is the Cormacks works. The railway line used to go along the front of the site, and as it stands now, the route of the old branch would be inside the fence.
Holcim may have sold off its operations at Cormacks, but it now seeks to establish a new cement works right alongside. In railway geography terms it will be about halfway between Cormacks and Lorne stations. The industrial site is smack bang in the middle of that field you can see, and the limestone quarry will be in the escarpment right behind it. In order to get the cement out, Holcim has called for the reinstatement of the old Ngapara Branch as far as its site. This means that the line will have to come along the front of the old Taylors works at Cormacks, so they will have to move that fence back in to leave room. At this stage a decision as to whether to build the Weston cement works is still in the pipeline but is expected later this year, if it happens it will replace the Westport works which took over from Burnside when that closed in 1988.
Holcim also wants to establish a sand quarry at Windsor for the cement works. This sits right next to the old Tokarahi Branch and part of it will be used as an access road. This is roughly a view of the area where the quarry will be (here it is on an overhead).
The third part of the Holcim Weston Option equation is the opencast coalmine to be opened at Ngapara. The area has a previous history of coalmining which operated until about 1970. The mine is to be in the hills just north of Ngapara and coal will be trucked to the cement works.
When I was digging around I also became aware there was a small limeworks operating at Tokarahi. As seen here and here. About it I don’t know much else. We don’t know without further research whether there was any lime railed out of the area. There used to be a Pringles limeworks in the area for many years. Was it the same site? This one looks like a small scale operation at least for the present. There is a Tokarahi Lime company based in the township below this hill, which is listed in a business directory as having 1-4 employees.

Sunday, 18 April 2010

Remnants of the Ngapara and Tokarahi Branches Today

The Ngapara Branch left the Main South Line at Waiareka Junction, the first station south of Oamaru. This line was constructed for the usual rural development reasons, as well as traffic of lime which is still produced in the area today. Work on construction began 1874 and the 24 km of track was completed three years later. The branch was cut back to Cormacks, continuing to serve a local limeworks, in 1959, and was closed outright in 1997. There is a proposal under consideration at present to construct a new cement works at Weston, the first station up the line. This would utilise Cormacks limestone and so require the reinstatement of the line to there. Coal for the plant would be mined at Ngapara and sand quarried at Windsor, both of which were stations on the full branch line, although there has as yet not been any suggestion of relaying the full length of track to these locations.
The Tokarahi Branch joined onto the Ngapara Branch at Windsor Junction and headed south and west for a distance of 19 km. It was opened also in 1877 and closed in the depression in 1930. This line was originally intended to go to Livingstone, a few km further on from the final terminus. Due to the fact that it closed 80 years ago, relatively little is known about the Tokarahi Branch, and the first three editions of the NZ Railway and Tramway Atlas failed to show any intermediate stations, while all editions to date only show one of the two tunnels that were constructed on the route.

View Larger Map
We begin our journey on Weston Road railway overbridge, crossing over the Main South Line at Waiareka. Looking north, we can see the branch formation curving around to the left. You should drive west from here 100 metres to the insection of Saleyards Road and then head north for another 100 metres to the former level crossing. The formation is easily seen, especially on the west side. Turn around and return to Weston Road, heading west. In the Weston township you can access the formation at former crossing sites in Essex Street, Gordon Street and Main Street; rail is still embedded in the road at the latter two. After crossing the formation at Main Street, continue north following a curve to the left onto Weston Ngapara Road. Weston was formerly the site of a limeworks and the location while unconfirmed could be in the Meek Street area alongside the railway route. Continuing west on the main road, 1 km further on the railway, very clearly visible as a raised embankment, approaches and  crosses over from the left side. 500 metres further on, you come to the Cormacks limeworks. The road dips as it approaches the works, leaving the rail embankment high above the road level. As the embankment gives way to farmland,  you can see that the rail route has diverged from the road, going close in to the hills. This situation lasts for about 3 km, when the route comes back towards the road to another crossing, which was via an overhead road bridge. This remains largely intact at the north side of the road, because the roading authorities chose to straighten the road by bypassing the bridge completely, cutting through the rail formation in the process. The formation is seen gradually curving away as you continue west on the main road.
A little further on there was a medium sized bridge, although nothing remains today. The road then takes a 1 km diversion away from the railway, during which you pass Coal Pit Road on the right, while immediately opposite the intersection you can see, apparently, the relocated Enfield goods shed and station. The road then sweeps left again to rejoin the railway on a long right hand curve where the formation was hard up against the left hand edge just outside Enfield. You can see another level crossing at Wellington Street. Continuing west on Weston Ngapara Road, the routes diverge rapidly and separate by as much as 1 km, although side trips are possible down Elderslie and Pine Hill Roads, the latter leading you to the general vicinity of Elderslie station. Further along the main road, Pig Island Road provides another optional diversion, while Windsor Road is recommended because it takes you to the eponymous station, which was the junction of the Tokarahi Branch. Turn right into Peaks Road and you can view the station area and the nearby junction. Head back to the main road and continue westward. Finlays Road on the left brings you to the site of Corriedale station. The road and rail remain separate by about 300 metres until the main road closes in at Queens Flat, the railway clearly seen after an S bend in the road. A small culvert is possibly seen at the approach to QF station. The rail now remains right alongside on the left of the road all the rest of the way to Ngapara. As you enter the township an old flour mill is on the right. I believe that the station itself was located just on the far side of Tokarahi Ngapara Road, alongside Railway Street.
You should now continue south/west on this road about 6 km to the triangular intersection at Island Cliff with Island Cliff-Duntroon Road. Continue on T N Road as it takes a left turn, heading south. After 1.5 km you come to the point where the Tokarahi Branch crossed this road. The Island Cliff railway station was in the trees on the south side of the road. Continue another 3 km to Tokarahi with the rail line just out to your right, on the way observing stone culvert abutments. The terminus was apparently in a paddock alongside some houses. Livingstone is about another 5 km due west. Continue on T N Road for another 300 metres to the intersection of Tokarahi Tapui Road and take the slightly left turn to the south. After about 1 km the road turns through 90 degrees to head east, and a further 2 km on, as the road dips down towards a signposted S bend, you see the rail route again in a cutting to the right. The line then curves around to run alongside the road as it zig-zags up the hill, clearly seen in cutting in the vicinity of Tapui station, where a house which may have a railway heritage remains. At the intersection with Cants Road continue on the right, crossing the formation after another 100 metres. Rail and road now diverge but the formation is visible at times higher up the hill by the lines of trees it follows. Drive 2.5 km to the intersection of Conlans Road and proceed up the hill about 500 metres to the point where it crosses over the top of the No.2 Tapui Tunnel. Continue up the hill to Peaks Road and turn right, driving another 3 km to the intersection of Tunnel Road, and proceeding another 1 km downhill to an S bend which crosses over the top of the No.1 Rakis Tunnel. This route should, in theory, give you good views of the railway formation below. Then continue down Tunnel Road to Victoria Hill Road and turn left into it. The rail route is further up the hill and is not too close until you approach Windsor, where it is seen sweeping round a couple of long bends as it runs towards the junction. Turn left into Peaks Road to view the station site, junction and a few hundred metres of the Tokarahi Branch until it disappears around the first bend.   

Remnants of the Dunback and Makareao Branches Today

The Dunback Branch left the Main South Line at Palmerston and headed inland to its eponymous terminus 14.2 km inland. Opened in 1885, the line was originally expected to head into Central Otago but these plans did not eventuate and it remained as a short branch until it was closed in 1968 beyond Inch Valley. This station had in 1900 been connected with another branch of 4 km to lime works at Makareao and this “Inch Valley Railway”, which took in the entire length from Palmerston after 1968, was later renamed the Makareao Branch. This line became known for the “stone trains” of limestone being hauled down to the Milburn Cement works at Burnside (Dunedin), which constituted the entire traffic of the branch in later years. After the Clyde Dam was completed in the mid 1980s, the output of the cement works declined significantly and it was closed at the end of 1988. Trains on the branch were suspended at the same time, and formal closure occurred on 1 June 1989.
The Makareao Branch is one of the few branches I have examined to have had substantial bridge structures left after the track was lifted. I photographed many of the bridges between the first crossing of SH 85 and Inch Valley in 1999, when I traced the line in detail. All of the bridges on the line were wooden beamed right up to the time that it closed; unlike many other branches, steel girders never made any appearance on this route. This probably accounts for the exclusive use of DI and DJ locomotives with their light axle loading on the stone trains in the diesel era. Most of the bridges were wooden beams and piers, but some had stone piers. Beyond Inch Valley there appear to be no bridge remnants on either line; the first bridge up to Makareao, the lengthy crossing of the Shag River, stood for several years after closure but was demolished in the mid 1990s; the second much smaller bridge appears to be gone as well. On the upper Dunback route, what bridge sites you can find are just abutments, including a small bridge or culvert in the Dunback yard. With the passage of time, it is of course likely that most of the bridge remains will disappear.

View Larger Map
Beginning at Palmerston railway station, you should drive north on SH1 for about 400 metres to the intersection of Stour Street, which crosses the highway on a north-south alignment. The branch line left the MSL about 50 metres before this intersection and curved around to cross SH1 on the far side of the road and then follow its eastern side. A slight embankment hump can be seen alongside the road approaching East Otago High School. At the school entrance is an old semaphore railway signal, resited, which may have been the old home signal for the branch, which if there was one, would have been close by. The embankment becomes very prominent after Brough Street and the first bridge is located near the road bridge a few hundred metres further on, which in April 2010 still had the beams in place, well hidden in the trees. The line continued straight along Stour St and crossed Factory Road, whereafter it curved around westward and crossed a second bridge which appears to have been removed (no public access). You should turn left and drive along Burraness Street towards SH85 and turn right. The road takes a slight left hand bend after about 300 metres and the railway converged from the right, about 100 metres away in this view of the vicinity of a small bridge, which was still in place in December 2007. After another 300 metres the railway crossed SH85 at a small angle and then curved to run along the left hand side. Both approaches are currently used as farm tracks. Hughes Road intersects on the left 100 metres further on, just beyond which the No.4 bridge can be seen, largely intact. 400 metres further on. Bridge No.5 can be seen opposite Switchback road. If you drive down Switchback Road you may see on the left the possible site of a ballast pit just before crossing the river, which was in use for gravel extraction in 2007. The first part of the Dunback Branch was originally built to access ballast reserves alongside the river in this vicinity, which would have required connecting sidings, the routes of which have not been determined.
Continuing north-west on SH85, the railway route is diverging from the highway at this location and the next bridge site is hidden behind a house, the route then closes into the road as the valley narrows. As the road veers right the railway was right alongside on the left, following a line of greenery. The stockyards 200 metres further on are at the site of Meadowbank, the first station after Palmerston; the railway formation is the dirt track in the foreground. About 500 metres past Meadowbank, the remains of No.7 Bridge can be seen to the left. The river this crossed could have been another possible ballast source; there is a hypothetical pit site about 100 metres away on the east side of the highway. Road and rail continue to run close alongside up past the intersection of Munro Road and McElwee Road, with a crossing fence still visible on the latter. About 250 metres further on, you come to the site of Bridge No.8, well hidden in the weeds. The formation is now clearly just behind the fence as you continue north-east on Highway 85. A side road at a slight angle on the right leads to a site that possibly could have been a ballast pit. Just before a left hand curve in the road, you pass the site of Glenpark station, followed closely by the site of No.9 Bridge, which still has the beams and a centre pier in place. The hills close in fairly quickly after this point and the road and rail stay close together, the latter becoming a farm track hemmed in behind a fence as the routes pass through a spectacular limestone formation. About 500 metres further on you pass the intersection of Craig Road on the right, the rail rises above the road and a solid stone culvert can be seen under it. Further limestone formations are seen just beyond the railway here, along with further cuttings becoming more necessary as the hills close in. About 300 metres after the intersection of Blair Athol Road on the left, the road crosses the signposted Downlands Creek, with the old railway bridge No.10, now decked over for farm access, clearly visible on the left. As the road exits the S bend you are now approaching the site of Inch Valley Junction, 500 metres further on. As you approach the southern end of the station there appears to be another stone culvert passing under the formation. Inch Valley is denoted by a widening of the formation, there otherwise being little to see here with most of the remnants that could be seen ten years ago having disappeared, such as the loading bank that used to be present here. In NZR days, Inch Valley had a siding connected to it which led to a ballast pit, and this was probably the large gravel pits behind the poplars directly opposite the station in the river bed, although I haven’t confirmed this.
As you leave Inch Valley on SH85, the road takes a left hand bend. The railway passes through a small cutting along the side of the hill, and then just as the road begins to curve, the branch to Makareao curved away to the right, crossing the highway and heading for the river. On the left, the line continued on towards Dunback. As the highway approaches a 90 degree curve, the railway veers further left, the embankment clearly visible as it curves to follow the road. As the valley narrows, the formation rises above the level of the road and then, as the road begins a sharp curve to the right, the railway route enters a rock cutting. At the inside of this curve, the line emerges onto solid stone retaining walls right alongside the road (2). Road and rail both pass through further rock outcrops and then the rail route becomes an embankment again on a right hand curve. As the road straightens, the formation continues to curve round to a crossing over the road, just before this you may see what appears to be an old crossing gate opposite a signposted rest area. About 600 metres past the SH85 crossing you may be able to see bridge remains in the riverbed next to a highway culvert; aside from this there is very little trace of the railway on the north side of the highway. At a long right hand curve on the road you can see the old road on the left, and I recommend you make a stop to view a solid stone arched single lane bridge that used to be part of the highway. You may also find rail bridge remains on the opposite side of the highway.  As you pass the intersection of Domain Road on the right, the rail formation becomes distinctly visible again on the right side of the road and is now seen clearly for the last 500 metres into Dunback. As you approach the station you can see a loading bank in the yard along with a railway house next to the road. You may be able to spot a bridge abutment just past the house. Continuing past what appears to be the local war memorial on the left, make a right turn into Murphy Road to view the end of the rail yard including stockyards and another loading bank.
Now retrace your steps, heading back east on SH85. After about 700 metres, take the left hand turn into Domain Road, crossing over the Shag River. 300 metres further on, turn right into Grange Hill Road, then 350 metres further take a left hand turn into Limekiln Road. After another 2.7 km the road crosses a small bridge over a gravel riverbed and then turns sharply left, bringing you directly alongside the Makareao Branch formation on your right. As the road approaches the limeworks, the formation is incorporated into the road. There are substantial historic remnants of the limeworks at this site, but it is on private land. As you return back down Limekiln road, you should be able to see the formation separate as it drops down a steep 1 in 35 gradient. The grade from Inch Valley was relentless between the first bridge and the limeworks, apart from a short level stretch for the second bridge. As you reach the road bridge, you may care to walk 500 metres down the stream bed to reach the site of the second rail bridge, although there appears to be little to see today. When you reach the intersection of Grange Hill Road, turn left this time and head down the Shag River valley on the opposite side from the highway and Dunback Branch. After about 800 metres go right to cross the Shag River (the straight ahead route is a dead end that heads into a gravel pit). After the right turn, turn left back onto Highway 85. Now drive about 500 metres towards Palmerston and take a left hand turn into McLew Road to cross over the Makareao Branch formation after 150 metres. Continue on the road to make a left hand turn onto a farm access road just after the bridge and drive about 300 metres to the east abutment of the 15-span Bridge No.1, of which only the abutments remain. On the near side (the road has been cut through the embankment) you can see the line disappearing up the grade towards Makareao as it approaches a pair of cuttings.

Sunday, 11 April 2010

Caversham’s Railways - 2010

This article builds on my previous one that was written a year ago, making use of newer information about Caversham and the deviation. Rather than a separate map, the overlay shown below is obtained from the NZ Rail Maps website, being the most recently updated version of the current map for the Main South Line throughout Otago. However, as these maps continue to be updated, that shown is not the most recently updated one, but the one that was current at the time of writing this article.

View Larger Map
Since writing the original article, I was digging around on the web and I came across photos posted by Darryl Bond on behalf of his friend, Ken Devlin of Dunedin, who is a prolific railway photographer. These photos showed me that the double track main line that was opened in 1910, was reconstructed and relocated as a new single track railway in order to make way for the motorway that was built through the Caversham area in the 1980s. The photos which have particular relevance are:
1814 3096 cav 
This shows a long train going around the curve and crossing the South Road bridges on what was then double track. The rail line is where the motorway is now. On the far side of the locomotives you can see a new embankment being formed, this is the new single track railway line. You can see that on the far side of the road, where the bridge is yet to be built, it will go on the near side of the little hillock, much closer to the houses than the present railway.
1808 1814 carisbrook stone A460_20090412_129
Taken from a different perspective illustrating the same scene, the left hand photo shows us on closer inspection that although this appears to be a double track railway, the second track was disconnected just west of the bridge. At this time, in fact, there was not a continuous double line from Dunedin through to Mosgiel; it was being singled in parts at that time. On the right we have the same scene today, one of my own photos showing clearly the way that the highway and railway are laid out today.
1808 1814 return carisbrook 
This photo implies fairly clearly that the second track was not in use at this location. In a double line area, this train would be running “wrong line”.
1814 1837 cav platform stone A460_20090415_011
The left hand picture shows the old Island platform at Caversham. What appears to be a road in the background parallel to the track is the new trackbed because the motorway now goes through where that platform was. This helps to explain why there is no real trace of Caversham station to be found today. On the right you can see more or less the same location as it looks today.
We now refer to the above map in more detail, as shown below:

View Larger Map
First of all, the motorway had been partially constructed at this time, from the city just as it is today, but it joined onto South Road just in the middle of this view, because the route through Caversham that it takes today had not yet been constructed. The first aqua line in the centre is the 1910s route as it was built and crossing South Road on a double track bridge, the route that now is followed by the motorway. The railway was deviated at the time of building the motorway, to take it onto the location of the red line, and the new single track concrete bridge was put across South Road. To the left of the picture you can see diverging aqua lines; this shows where I believe the 1870s and 1910s lines diverged.

View Larger Map
Now carrying on into Caversham itself, you can see that the line continued south of its former alignment into Caversham (1910s location) at the far left side. I believe that the 1870s station was a little bit to the east of the 1910s location. At Caversham the 1910s alignment meets the present (1980s) alignment as relocated for the motorway. What you see today at this location has been altered in appearance by the motorway works, which more or less completely cover the 1910s railway route.

View Larger Map
And then finally we have the bisecting of Caversham itself. Ironically two railways could not do this; but the motorway did. It says something rather strongly about the environmental impact of motorways. Those five black lines more or less vertically in the map are five streets that were cut in half by the motorway. When the first railway line was put through in the 1870s, there were five level crossings. Then in the 1910s the new railway was built and five overbridges were erected. Now with the motorway, only one overbridge remains, for pedestrian use. The streets were simply cut in half, and the halves got different names. And a lot of houses were bulldozed. The 1870s railway is the aqua line, the 1910 and current railway is the red line.

Saturday, 10 April 2010

South Island Main Trunk, Dunedin-Palmerston, Part 2: The Route

OK, here’s part 2 of this series, and here we look at the route with the help of Google Maps.

View Seasider in a larger map
The above is an actual Google map rather than overlaying Google Maps with a KML file like I have often done. However, you can still get the KML file for this map and enjoy the superior functionality and detail of Google Earth by going to the NZ Railmaps website (Blog Maps).
The aim of this post is to detail significant features and what I know about them, between Dunedin and Palmerston. To do that, we’ll zoom in on bits of the map as we go along.

View Seasider in a larger map
The first bit of detail going north from Dunedin is the deviation at Pelichet Bay. This used to be an actual coastal bay in Dunedin and there used to be a station there. The green line shows roughly where the original railway route might have been and the round symbol is roughly where the station might have been. At a guess Parry St is roughly the route. When the railway was originally constructed, I believe that it followed the shoreline. Later on, a causeway deviation was built and the land in between was reclaimed. Since then there has been a lot more reclamation. The land where the line used to go was about where the South Seas Exhibition of 1925 was held – and that’s the year that the deviation was opened, apparently. Now that site is where Dunedin’s new World Cup stadium is being built. The causeway was opened as a double track, but before then, the main line from Dunedin to Pelichet Bay station was doubled around 1908.

View Seasider in a larger map
Getting a bit further north from Dunedin there were a number of shorter sections where the line wound in and out of the bays, following the shoreline of the time. Causeways were built to straighten, flatten and double the line in these areas also, but the bays were not reclaimed. NZRTA4 says that the first causeway was opened in 1931. We don’t have any readily accessible information on the curves and gradients of the original route, but it’s a reasonable assumption from the road that now follows the shore that curves were sharp and grades in places were steep by rail standards. So we can comfortably assume that there was a three part improvement in operating conditions.

View Seasider in a larger map
This map shows the longest causeway, over 1 km across two bays, which took the line into Sawyers Bay station. At its northern end a new 313 metre double track tunnel was dug beneath the suburb of Roseneath, replacing an earlier 103 metre tunnel. There is no obvious trace of the older tunnel today, and as a road follows the original railway route, it would be a reasonable assumption that the tunnel could have been demolished to make way for the road. As my previous post about double track in Dunedin notes, NZRTA4 raises a question mark over whether this double track causeway ever had the second track laid. The tunnel is dated 1939 and the deviation was opened for traffic in 1948.

View Seasider in a larger map
North of Sawyers Bay is about where the ability to make further improvements to the railway got a lot more difficult and expensive. I remember reading somewhere that a proposed solution was to put in a big tunnel between Sawyers Bay and Waitati to overcome the grades and curves. As the straight line distance between the two places is about 9 km, this would have been a pretty difficult and expensive project. Obviously it would never have got high enough up the priority list and today it will never likely happen because there is not enough traffic on the route to justify it. Sawyers Bay-Merton may be an unfortunate bottleneck, but the road is not really much faster so it is tolerable in the same way as the Dashwood Pass is tolerated on the Main North Line. In the railwaymania era there probably would have been deviations built but the likelihood of such things today is pretty small.
What was possible and necessary in the difficult 45 km section between Sawyers Bay and Merton has mainly focused around four of the five tunnels. Going north, the first of these is the No. 6 daylighted in 1971. After that you have the No.5 Mihiwaka Tunnel, and the work here has been mainly driven by necessity, needing to strengthen and repair the tunnel’s lining because of ground movement. There have been clearance problems here at times, too. I don’t know whether there are any long term plans at present for further improvements here, or whether the clearance issues currently pose any limitations for the type of freight than can be carried on the line. The most recent works done in the tunnel were just last year, a Dunedin firm cut out sections of the original bluestone wall/ceiling lining and replaced it with concrete. Repairs to this tunnel are a pretty regular event and must have driven the proposals for a new tunnel years back but I know nothing more about whether more significant work is on Ontrack’s list. The Cliffs Tunnel No.4 is an interesting one that I don’t know very much about at the moment. I have heard a story that there was not a tunnel here originally, that the tunnel was put through to bypass a difficult dangerous cliff face section. The photographs tend to support a contention that the track might once have gone around the side of the tunnel. Apart from  that I don’t know any more about it.

View Seasider in a larger map
The last of the four tunnels, No.3 is much more interesting; it is the notorious Puketeraki Tunnel.  This was built as 157 metres in length and was an original feature of the line. The area through which it passes is the same area where Seacliff Lunatic Asylum was built and where State Highway 1 passes over the “Kilmog”. It is all well known as an area of unstable land that has caused lots of problems over many years. The Puketeraki had years of work done on it before the Railways decided in the mid 1930s that they’d had enough and that they would put the track around the side of it. But this has led to a very sharp curve which I guess could be only 130 metres in radius, and trains have to go fairly slowly through it. However in the area curves around 140-150 metres are often seen and the grades tend to limit train speed anyway. The tunnel can still be seen today, particularly at the northern end where there is a distinct embankment approaching the clearly visible portal.
In between Tunnels 3 and 4 the line takes a long curving route around the coastline at Waitati, and this is the intermediate stage between the twin peaks of the Sawyers Bay-Merton route. Just north of Merton is a bridge across the Waikoauiti River then a long straight, flat approach to the eponymous township with its well known racecourse. About three years ago SH1 was deviated to the west of the township, bypassing a level crossing within the urban limits and also redundancing the highway overbridge at Tumai, though it remains in use for local access. There are one or two places where curves have been eased before the line enters Palmerston on a north-south alignment, turning north-east to run alongside the highway through the town.
The main map also shows the Dunback and Makareao Branches. This is largely as an interest factor in Palmerston, although on my trip I did take a walk along the first straight, this was limited by the fact the train only stopped for a little over half an hour. If we had been there longer I could have had a closer look at the line right up to where it crossed over State Highway 85.
Part 3 of this series is a little way off yet as I still have a lot of work to do on the photo album for this trip. Stay tuned…