On the Otago Central trail [2]

I have now completed detailing the map and am preparing to generate page views for the map document. For the meantime I am starting with the Cromwell end because of the work I have done here to determine where the line went, this will be published as an interim release of the map as the rest of it will take another day or so to finish. Here for now are the 15 images for the mapping of the Cromwell Gorge, because this is a substantial point of interest with the significant changes due to building the hydro dam and raising the Clutha River through Cromwell Gorge.
It should be noted that the below is an interpretation of maps and GE coverage and the exact route of the railway today is uncertain because of large scale changes in the Cromwell Gorge associated with the hydro development. For this reason the purported rail route is marked as, “Inexact Route”. However just because the highway alignment today is similar to what it was back in 1980 doesn’t mean that the bulk of the rail route is out of the water. There are one or two particular places where this is in fact the case and they are near Cromwell. For the rest of the route, most of it would be under water today, or buried by construction works associated with the dam.
It is generally documented and accepted that the highway was taken further up the side of the gorge and therefore the lower formation of the highway was abandoned with the railway alongside. There has been some speculation, particularly in a TV programme, that this means some rail remains could be found below the waterline. However, Dangerfield & Emerson states “nothing remains west of Clyde” although I believe there are a couple of pieces of formation still out of the water. It is important to note as well that there was large scale contouring of the gorge sides below the waterline in various places throughout the Gorge which was necessary to stabilise numerous landslips that exist throughout the Gorge. These works would have buried or destroyed any remnants of the railway line. I wouldn’t rule out some remains may exist but because of all of the earthmoving work done for the hydro development, which was a lot more than at most hydro sites, a lot will have disappeared.
Earlier in the week I did post in this same article my belief that the highway was simply higher on its existing site. This has proved to be a mistaken view. The railway formation is laterally displaced from the current highway by perhaps 100 metres in some places and at a lower level. Therefore rather than saying it is all buried under the highway, it is more correct to say that it is either underwater or buried under dam construction works. The NZMS1 maps show that the highway in the 1960s appeared similar to the current highway. In retrospect it is very difficult to see a 100 metre difference on a 1:63360 map, which at that scale would be of the order of 2 mm. The highway would appear similar because it still follows similar contours of the land. On the other hand the maps I have drawn are depicted at a scale of 1:6000 and it is possible to show what will be a significant change of location at such a scale. Therefore I am going to redraw the maps in the knowledge that the railway line is significantly displaced but this will not be easy to do, so it will never be more than an approximation.
The original maps with this article are temporarily withdrawn until the new maps have been assembled.

Wednesday, 2 January 2013

On the Otago Central trail [1]

Yesterday I started work on the map of the Otago Central Railway and it is progressing well. The OCR is a line we know a lot about because of the research done and books that were published, notably Dangerfield & Emerson, and also because the Department of Conservation has done archaelogical surveys of the bulk of the route which remains in the Rail Trail. Thus the map document will include a full list of stations, and most of the bridges beyond Middlemarch, as well as ballast pits etc. Of course with the benefit of GE or Bing Maps coverage we can also determine fairly accurately where some of these places were as well. There is some of the area that still has only medium GE coverage but those areas are also covered by Bing Maps at a higher resolution. The DOC bridge list includes grid references to the obsolete NZMS260 series maps rather than latitude/longitude coordinates. LINZ have coordinate convertors on their website to turn these grid references into WGS84 latitude/longitudes. So then I was able to check these coordinates in GE. It is good to see that Google has gone back to having visible points when editing paths in the latest edition of GE.
The table list of this data has now been completed and can be seen in the documents uploaded to the website. The maps are being drawn up and this posting will include some points of interest found so far with the maps.
Firstly, Wingatui. We know that the layout was different before the main line from Dunedin was duplicated and upgraded. One part of these works was to build a new double tracked tunnel to the west of the old single tracked tunnel (which is still there incidentally). In part because of this but also for more convenient operation, Wingatui station was moved to be closer to Dunedin.
wingatui
On the old single track route, Wingatui was further west as shown, and originally trains which stopped at Wingatui used to have to reverse to go up the Central with the triangle leg shown. Later on, according to Dangerfield & Emerson, there was a backshunt put alongside the main line closer to the racecourse, and trains for Central would set back from the Wingatui station before going up the leg that faces Dunedin. The duplication works completed in 1914 changed all that by moving Wingatui to the east. Then both tracks would be able to connect to the facing leg (the leg going the other way was apparently lifted with the change in layout). Now the mainline has been singled again, things are a little simplified in the yard. The little dot over Paterson Road is where the overbridge is – I haven’t yet drawn that in. The zero peg for the Taieri Branch is just west of that bridge.
TaieriSidings
Firstly, at Taieri / Wingatui we have the Taieri Industrial Estate sidings to the left, and on the right we can see a proposed route for the Taieri Ballast Siding. There is not enough documentation about the latter nor any ground evidence today to confirm its route, although we do know where it joined the main line (3.2 km) and where the pit was that it went to. The Taieri Industrial sidings are what was shown in the LDS data layers. These are the siding for Fisher and Paykel to the right, a timber plant at the bottom (I think) and the Silver Fern Farms (ex Fortex) meat processing plant to the left. The layout has been changed quite a lot since the F&P plant was taken over by Fonterra and the current layout is shown below. It also shows a loop on the SFF (now Polarcold Coolstores) siding, which I think has always been there.
TaieriSiding2
As you can see, the Taieri Estate sidings now start with a headshunt just to the north of Silverstream Bridge, and the sidings all go off this. The original siding is the lower curved one and has been extended with an extra loop. The backshunt that used to be used by F&P (it never went inside any building, even though the building layout has been changed by Fonterra) is gone. The biggest change to the site is the two new sidings added at the north side, the backshunt of which goes right up to the boundary with Polarcold.  (Note the above map is a bigger scale than the previous one).
The Taieri Industrial Branch ends just a bit further north at 3.5 km and the Taieri Gorge Railway starts there. At the location they call North Taieri, the TGRL have built a crossing loop for their trains. I presume crossing a train there is cheaper than doing a crossing on Kiwirail’s tracks. The last time I went to Middlemarch on the TGRL which was 3 1/2 years ago, we crossed a train there because it was a busy day with two trains running. So as our train came off the TGRL, we crossed the train going to Pukerangi that day.
ntaieri S5_20090412_263
On the left you can see what North Taieri looks like on the map. On the right is the crossing of our train. Because of the wagons that had been left in the loop, the Pukerangi train had to back out of the loop back on to the main line after our train had passed. North Taieri is roughly at 4.0 km, which puts it a little to the south of the location of North Taieri Tanks, a set of water tanks that were used to top up steam locomotives in the earlier times of the line (closed 1936). The original length of the Taieri Industrial Branch was to have been 4.0 km but the end was moved back to 3.5 km because it was too close to the level crossing, apparently it would have made Kiwirail responsible for the crossing in some measure.
At the moment there is a lot more I could do in terms of looking at where things are or used to be on the OCR. I’m not going to look at everything just now, but definitely will come back to some things at a later date, like where some of the other ballast sidings went – I just picked up the Taieri one from my old Google Earth stuff.

Sunday, 30 December 2012

Kawatiri, Gowanbridge, Murchison, Inangahua?

Right now I am mapping the Nelson Section and as part of that I’m doing my best to document what went beyond the final terminus of the line when it closed in 1955, which was at Glenhope. As we all know, Kawatiri was opened in 1926, but it closed in 1931 when all the construction works were stopped. By that stage Gowanbridge was almost completed and due to be opened shortly, and much of the section to Longford (Mangles River), just outside Murchison, was under construction. The line to Gowanbridge remained in place until 1942 when the track was lifted for use elsewhere, and trains never ran beyond Glenhope again.
Thanks to some work by Tony Hurst (author of several of railway books, and a helper in this NZ Rail Maps project), we know that surveys on both banks of the Buller River were undertaken by 1937 from Longford to the vicinity of Ariki Falls. At the time of writing this, I don’t have the publication which Tony scanned describing the survey work, but will endeavour to obtain it in the near future. Murchison was at about the 132 km point assuming Longford was at about 130 km. O’Donnell (When Nelson Had a Railway) states that the permanent line survey was completed to about 141 km, which is roughly Ariki Falls. A rough measurement of distance following the highway from Ariki Falls to Inangahua, where the line was to have joined the Stillwater Westport Line, comes out at about 33 km. Therefore the total distance to Inangahua would have been in the vicinity of 170-175 km from Nelson. The construction works needed in the upper Buller Gorge would have been substantial, considering what was needed in the lower gorge where the SWL went, which needed a significant number of large bridges as well as several tunnels, and which because of these challenges was not completed until 1942.
Here are sections from the forthcoming map of the route south of Glenhope. As I have no maps available to show where the railway went south of the final terminus, it is marked on the map as “Inexact Route” using the symbol for an uncertain formation. Ghost hunters these days face a challenge in that the highway between Glenhope and Kawatiri was substantially improved about 10 years ago, which encroached on the rail formation in places, and has probably made it much more difficult to determine the route today.
gtk01
A view of the Glenhope area. There was a coal mine in the area at the time the NZMS1 map was drawn up in the 1940s but there is little known about it today. A ballast pit just south of the station became a locomotive dump in the late 1930s when two FA class steam engines were abandoned there, later scrapped. The highway was altered, probably about 10 years ago when the Glenhope-Kawatiri section of SH6 received major improvements. The old section on the left and its one way bridge are mostly still intact used for local access. Glenhope station building remains today although in dilapidated condition as a farm building.
gtk02
View of Kawatiri. The railway came in from the north and crossed over the Hope River on a bridge, the concrete piers of which are still visible today. It then passed through the Kawatiri Tunnel, only the second on the entire line, and then crossed another bridge (currently rebuilt as a footbridge) before arriving at Kawatiri railway station. The highway to Blenheim was up high on a bluff to the west of where SH6 is today, which led it onto an overbridge across the line and then onto a Howe truss across the Hope River, part of which remains today as part of the Kawatiri station historical precinct. The highway to Inangahua continued along this bluff until it joined the existing highway south of Kawatiri. These days the highway passes through the former station site, the overbridge and then the Howe Truss having been progressively eliminated. I presume the formation of the old highway is still there somewhere in the bush to the west of the current road. These days the Kawatiri station site is where you can access a public walkway through the old tunnel. The walkway ends at the northern portal of the tunnel where a loop track takes you back around the ridge over the tunnel.
gtk03
General view of Gowanbridge. An overbridge was provided for the Gowan Valley Road at the east end of the station yard. This bridge remained a number of years after closure but no longer exists today. The last construction works were undertaken to the west as far as Longford and should have seen trains running to Murchison by about 1932-33. In the event, the cessation of work meant the formation was incomplete although remnants of it can still be found today. The large cutting just west of Gowanbridge is now used by the highway (possibly this is the cutting immediately adjacent to the Granity Creek bridge) but the unfinished embankment across Grassy Flat (possibly just west of Granity Creek) remains visible today. Further west, concrete culverts or abutments can be seen in paddocks beside the road. It is my understanding that other substantial formation can be seen in places all the way to Longford, possibly including bridge approaches either side of the Owen River, although it is many years since I last travelled this route and there has never been an opportunity to further investigate any remnants. (Footnote: An old concrete bridge abutment is visible immediately south of the Owen River highway bridge but it is unclear if this had anything to do with the railway or is leftover from a former road bridge)
gtk04
The last image shows survey routes which were in the document I referred to earlier. Starting from a point at the upper right of the image, roughly opposite Nuggety Creek, a route was surveyed down the true right side of the Buller towards Longford; closer to that location another survey line was started on the true left side. These surveys continued past Murchison (in the middle on the south side of the river) and onwards towards Ariki Falls which is the loop in the river to the far left side of the image – note that the highway follows the river, but the railway probably would have cut across the loop. The source document wasn’t detailed enough to show exactly where the survey lines went so I in part followed the local major road routes. I think that the railway ended up following the true left route as far as Longford under construction and that the Mangles River would have been bridged near the current road bridge.
There will be another post tomorrow of some other parts of the map that is currently being completed for publication, and then the map itself will be published, which should occur tomorrow or Tuesday. It will appear on the Skydrive website as usual, where the draft in Word format is currently being saved, and will be the first map publication to use vector graphics maps, which will greatly improve the print quality.